  • Project Todbrook Reservoir
  • Location Whaley Bridge
  • Client Morrison Construction
  • Value: £260,000.00
  • Date August – Oct 2008
  • Duration 12 Weeks
  • Accident Free Shifts 500

More Images:

Todbrook Reservoir Todbrook Reservoir Todbrook Reservoir

Project Details

Todbrook reservoir underwent a “flood condition” assessment under reservoir legislation which highlighted the need to repoint/seal all the insitu concrete slabs on the main spillway and raise the height of the North side spillway wall to include a wave definition profile.

Pouring over 60m3 of pumped C45 concrete at an incline of 1 in 2 to raise the wave wall over 100 linear metres. 

A synopsis of the project is detailed below:
 
·               Install slope/fall protection arrangements,
 
·               Install safe scaffold access to the wave wall at a typical gradient of 1 in 2 to both sides.
 
·               Rake out and re-seal with 2 pack sealant to over 1500 linear metres of spillway panel joints.
 
·               Design and fix shutter arrangements and pour schedules to facilitate a complex hit and miss pouring scheme
 
.        Pouring over 60m3 of pumped C45 concrete at an incline of 1 in 2 to raise the wave wall over 100 linear metres.
 

 

Latest News

  Latest News Railway-bases supply of labour. At the beginning of September 2009 a Labour Supply division was added to the company. This specialises in the supply of high quality trained contractors involved in railway work. Such staff include, Engineering Supervisor (ES), Personal Track Safety (PTS), Crane Controller and Controller of Site Safety (COSS). This service will fulfil the needs of those companies that employ some railway train...Read More